How It’s Done of the Day: A mere six days after repair work began on an earthquake-demolished section of the Great Kanto Highway in Naka the road was ready to be reopened.
[dailymail.]
God bless Japan.
This is amazing.
To the degree that the generic utilitarianism of that civilization assumes more defined, more open, and more limiting characteristics, the intoxication of material prosperity increases the impatience of its children to propagate that doctrine and enshrine it with the historical importance of a Rome.
How It’s Done of the Day: A mere six days after repair work began on an earthquake-demolished section of the Great Kanto Highway in Naka the road was ready to be reopened.
[dailymail.]
God bless Japan.
This is amazing.
Going through my old likes and came across this. In our town one...flooded and badly...
Marico….6 DIAS!===!?!!?¡!¡!? …. aquí ni siquiera han terminado el metro D: y tiene como no se… 20 años… D:
Reí infinitamente al leer el comentario “Un saludo Eve!”
LIKE A BOSS.
GO JAPAN
^ what Joey said. haha.
Dude, can they do this in Marcos Highway?